Tuesday, June 18, 2013

Latest local news, weather and high school sports for Toledo area

Crack in concrete studied at Davis Besse nuclear plant
Posted: 10.14.2011 at 2:50 PM
0
Davis Besse Nuclear Power Plant in Oak Harbor  / WNWO Newsfile
Photo

OAK HARBOR (AP) -- Contractors replacing the cracked reactor head at a northern Ohio nuclear plant have discovered a small crack in the thick concrete on the outside of the reactor's containment building.

Federal regulators and the plant's owner are reviewing whether the crack is a serious issue for the Davis-Besse plant outside Toledo. Nuclear Regulatory Commission spokeswoman Viktoria Mytling tells The Plain Dealer of Cleveland the matter will need to be resolved before the reactor is restarted.

Akron-based FirstEnergy Corp. shut down the plant almost two weeks ago so the new 82-ton reactor head could be installed. The building's concrete shell 2 ½ feet deep is meant to protect the reactor from tornado debris, an aircraft of anything else that might hit it from outside.

(Copyright ©2011 by The Associated Press. All Rights Reserved.)

Related Links

Popular Stories
Thumbnail
Baby Elaina's injuries revealed and national TV interviews uncover new information
Angi Gonzalez  |  Yesterday at 12:55 AM  |  7 comments
Thumbnail
Exclusive look at the room where Elaina was last seen
Chris Delcamp  |  Yesterday at 6:52 PM  |  7 comments
Thumbnail
Day 15 in the search for Elaina Steinfurth
Hubert Wiggins  |  Monday, June 17, 2013  |  2 comments
Follow Northwest Ohio
Get news and weather notifications on your phone by downloading the iPhone or Android app below
Sign up to get alerts and updates for breaking news, severe weather, and deals:
submit
ADVERTISEMENT
Special Features
Like us on Facebook
Join the conversation!
Best Bets
Get the info you need, straight from the experts
Wake up with WNWO Today
Join the WNWO Today crew starting at 4:26 a.m. daily.
ADVERTISEMENT